Molovin Plantation Activities:

July 1: Spraying walnuts – protection and fertilization.
July 2: No work due to rain.
July 3: No work due to rain.
July 4: Filling the tank – Irrigation.
July 5: Filling the tank – Irrigation.
July 6: Filling the tank – Irrigation.
July 7: No work.
July 8: Spraying walnuts – Foliar fertilization – Calcium.
July 9: Pruning 2 – Fertilization through the system with potassium nitrate.
July 10: Pruning 2.
July 11: Pruning 2 – Fertilization through the system with potassium nitrate.
July 12: No work.
July 13: Pruning 2.
July 14: No work.
July 15: Spraying weeds.
July 16: Mowing grass – Filling the tank.
July 17: Mowing grass – Filling the tank.
July 18: Mowing grass – Filling the tank.
July 19: Adjusting solar panels – Filling the tank – Digging a trench for a new well to supply water to the tank and cables to the facility.
July 20: Equipping the new well – Filling the tank.
July 21: No work.
July 22: Filling the tank.
July 23: Filling the tank.
July 24: Mowing around the facilities with a trimmer.
July 25: Spraying walnuts – protection and fertilization – Setting up the cable for the new well.
July 26: Completing the installation of the new well – Filling the tank – Releasing fertilizer through the irrigation system – Ammonium sulfate.
July 27: Filling the tank – Releasing fertilizer through the irrigation system – Ammonium sulfate – Pruning seedlings and tying.
July 28: No work.
July 29: Backfilling the trench from the new well to the facility, spreading rubble where mud forms on the roads within the plantation, pruning seedlings and tying – Irrigation.

Rekovac Plantation Activities:

July 1: Hoeing the reserve seedlings in the trench.
July 2: No work due to rain.
July 3: Spraying weeds around the seedlings with herbicide.
July 4: Spraying weeds around the seedlings with herbicide.
July 5: Spraying weeds around the seedlings with herbicide.
July 6: Spraying weeds around the seedlings with herbicide.
July 7: Spraying weeds around the seedlings with herbicide.
July 8: Removing roots from the plot.
July 9: Removing roots from the plot.
July 10: Removing roots from the plot.
July 11: Removing roots from the plot.
July 12: No work.
July 13: Pruning seedlings.
July 14: Pruning seedlings.
July 15: Pruning seedlings.
July 16: Digging irrigation channels.
July 17: Concreting the well shaft – Digging holes for container footings and leveling the ground.
July 18: Concreting the container footings.
July 19: Watering the concrete to prevent cracking and organizing other work with Braco.
July 20: Watering the concrete to prevent cracking and organizing other work with Braco.
July 21: No work.
July 22: Plowing.
July 23: Fertilizing seedlings – manuring and plowing weeds.
July 24: Plowing weeds.
July 25: Plowing weeds – Transporting and installing the container.
July 26: No work – Tractor driver not available – Machine for digging channels under maintenance, irrigation workers on vacation.
July 27: No work – Tractor driver not available – Machine for digging channels under maintenance, irrigation workers on vacation.
July 28: No work – Tractor driver not available – Machine for digging channels under maintenance, irrigation workers on vacation.
July 29: No work – Tractor driver not available – Machine for digging channels under maintenance, irrigation workers on vacation.

Special Notes:

🌤️ Weather variations, including rain and strong winds, have intermittently impacted our operations this month.

🚧 Continuous focus on infrastructure improvements and meticulous care for our walnuts and seedlings.

💬 Stay Connected: We value your engagement and look forward to discussing our efforts and your insights during our upcoming Q&A sessions.

🔗 For More Detailed Insights: Visit www.thewalnutfund.com or join our community discussions in our WhatsApp group.